
Add to Cart
ANSI B16.5 Carbon Steel Slip On Flanges A105 CARBON STEEL SLIP ON FLANGES
Description:
Slip on pipe flanges are joined, generally both outside and inside, to offer potency and stop leakage. Slip on pipe flanges can at times as well have a ring/boss or a focal point, and can be made up by means of a bore to go well with either tube or pipe.Meanwhile, hub pipe flanges and ring pipe flanges are both believed as slip on pipe flanges, for the reason that they both slip above the pipe.
Specifications:
Flange Standards | ANSI, ASME,DIN, JIS, BS4504, EN1092, ,MSS, AWWA, etc |
Pressure Rating | 150# 300# 600# 900# 1500# 5K 10K PN10 PN16 PN25 etc |
Process | Forged |
Production technique | Forged, Heat treated and machined |
Types | Weld Neck, Blind, Slip-On, plate,Socket-Weld, Threaded, Orifice, Spectacle Blinds etc |
Sealing Face | RF FF RTJ RJ Face |
Flange Heat Treatment | Normalizing, Annealing, Quenching,Tempering |
Packing | Free Fumigation Wooden Cases/Pallets and Customized |
Size | ASME B16.5:1/2"-24" ASME B16.47:26"-48" |
Rating | 150LB/300LB/600LB/900LB/1500LB/2500LB |
Standard | ASME B16.5, ASME B16.47A, ASME B16.47B, MSS SP 44, DIN 2632, DIN2633, DIN2634, DIN2635, DIN2636, JISB2220, BS4504, GB, etc |
Material |
|
Surface | Black Painting / Anti Rust Oil / Hot Dip Galvanized |
Certification | ISO 9001:2015 |
Packing | Plywood cases, pallets, or as per your request. |
Application | Petroleum, chemical, machinery, electric power, shipbuilding, papermaking, construction etc |
Port of delivery | Xingang port |
FAQ:
1.)Are you a trading company or Factory?
We are a real factory with our own producing machine and warehouse,started to do business from year 1993
2.)How long time of your longer cooperation customer?
Many customers have long cooperation with us,such as European customer cooperated with us 15years.and more.
3.)What is your advantage?
Best quality,low price,special service,each customer information record.
4.)What about your delivery time?
quantity less than 500tons,25days after get deposit,above 500tons will need 30-35 working days.